﻿GET_GEVOMechL2_09_01_01_18 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:07,875
7. Re-torque the bolts to 16-8 lb.-ft. (22-24 Nm).

2
00:00:07,875 --> 00:00:15,667
8. Assemble the brush holder and stud assembly to the brush holder yoke but do not tighten the mounting bolt.

3
00:00:15,667 --> 00:00:25,958
9. Ensure that the 0.06 inch (1.52 mm) thick paper is in place to protect the collector ring surfaces.

4
00:00:25,958 --> 00:00:39,417
10. Using the 0.5 - 13 alignment pins, slide the yoke with all three brush holder assemblies into position, then start six of the brush holder yoke to mounting block fixing bolts.

5
00:00:39,417 --> 00:00:50,000
11. Tighten the six fixing bolts until the yoke assembly does not move, then remove the two alignment pins and insert the two remaining fixing bolts.

6
00:00:50,000 --> 00:01:02,875
12. Torque all eight bolts to 165-185 lb.-ft. (223.7-250.8 Nm).

7
00:01:02,875 --> 00:01:11,792
13. Align the new brush holder and stud assembly as discussed in the Brush Holder and Stud Assembly Alignment section of this module.
