﻿1
00:00:00,000 --> 00:00:09,917
<b>Warning:</b> The U-tube, wheels, gear, and axle assembly weighs approximately 6,000 lbs. (2,722 kg). 

2
00:00:09,917 --> 00:00:14,708
Ensure that the crane and cables are adequate to lift and move the assembly. 

3
00:00:14,708 --> 00:00:25,583
<b>Warning:</b> When the wheels, gear, axle, and U-tube assembly is lifted, the U-tube will quickly rotate to the open-end up position and may injure personnel standing nearby. 

4
00:00:25,583 --> 00:00:32,125
As the assembly is being lifted, support it to allow the U-tube to slowly turn to the open-end up position. 

5
00:00:32,125 --> 00:00:43,042
4. Lift the U-tube, wheels, gear, and axle assembly with a crane or hoist; rotate the assembly so that the U-tube mounting surface is facing downward. 

6
00:00:43,042 --> 00:00:48,875
5. Line up the mounting holes and lower the assembly onto the traction motor. 

7
00:00:48,875 --> 00:00:55,042
6. Verify that the two gears are properly aligned and that the teeth are engaged. 

8
00:00:55,042 --> 00:01:00,917
<b>Note:</b> While installing the U-tube-to-motor mounting bolts, check the bolt head for the bolt grade. 

9
00:01:00,917 --> 00:01:05,792
Discard all grade 5 bolts and replace them with grade 8 bolts. 

10
00:01:05,792 --> 00:01:25,042
7. Lubricate the threads of the eight U-tube-to-motor mounting bolts and under the bolt heads and both faces of the associated washers with a Wabtec approved Moly-based lubricant (84B565364A1) and wait until dry to touch (approximately 5 minutes) before assembly.

11
00:01:25,042 --> 00:01:41,958
8. Start the eight mounting bolts by hand and then torque the bolts to 1325 ± 75 lb.-ft. (1797 ± 102 Nm).

12
00:01:41,958 --> 00:01:48,875
<b>Note:</b> Follow the proper torque sequence to prevent the U-tube mounting bolts from loosening on the traction motor.

13
00:01:48,875 --> 00:01:54,875
9. Install the two 5/8-inch bolts into the U-tube drain holes.