<b>Warning:</b> The traction motor, wheels, and axle assembly weighs approximately 12,000 lbs. (5,443 kg). 

2
00:00:11,000 --> 00:00:15,750
Ensure that the crane and cables are adequate to lift and move the assembly. 

3
00:00:15,750 --> 00:00:26,958
<b>Warning:</b> When the U-tube, wheels, gear, and axle assembly is lifted, the U-tube will quickly rotate to the open-end up position, and could injure nearby personnel. 

4
00:00:26,958 --> 00:00:33,917
Support the assembly as it is lifted, allowing the U-tube to turn slowly to the open-end up position. 

5
00:00:33,917 --> 00:00:39,125
10. Attach a nylon lifting strap to each axle journal bearing. 

6
00:00:39,125 --> 00:00:45,583
11. Lift the motor, wheels, and axle assembly and rotate it 90°. 

7
00:00:45,583 --> 00:00:50,250
12. Position the motor nose on wooden blocks. 

8
00:00:50,250 --> 00:00:57,875
13. Remove the motor-side and wheel-side axle bore seals (gutters) from the axle. 

9
00:00:57,875 --> 00:01:03,667
<b>Note:</b> The axle bore seals should be replaced when wheels are renewed.