Typical steps to assemble the gear case are as follows:

2
00:00:04,000 --> 00:00:12,583
<b>Warning:</b> The motor, wheels, and axle assembly weighs approximately 13,000 lbs. (6,000 kg).

3
00:00:12,583 --> 00:00:17,083
Ensure that the crane and cables are adequate to lift and move the assembly.

4
00:00:17,083 --> 00:00:27,458
<b>Caution:</b> Thoroughly clean all components in the gear case before assembly to ensure acceptable performance of the traction motor pinion end rotor bearings and gearing.

5
00:00:27,458 --> 00:00:33,042
The split line and pinion bore must be free of oil residue and residual sealant.

6
00:00:33,042 --> 00:00:37,333
The baffle and magnetic plugs must be free of dirt and debris.

7
00:00:37,333 --> 00:00:43,250
<b>Note:</b> Use DOW 832 sealant to seal the metal and plastic joints.

8
00:00:43,250 --> 00:00:46,792
Full curing time for the sealant is 24 hours.

9
00:00:46,792 --> 00:00:52,208
1. Position the nose of the traction motor down on wooden blocks.

10
00:00:52,208 --> 00:01:07,083
2. Using the Guide Pin Kit (Part Number 41B539007G2), install the motor-side axle seal (gutter) on the axle with the lip of the seal located over the flinger.

11
00:01:07,083 --> 00:01:15,000
<b>Note:</b> The gutter split line should be parallel to the ground with the latch located on the right in the bottom gear case half.

12
00:01:15,000 --> 00:01:28,375
3. Apply a 0.125 to 0.25-inch (3.18 to 6.4-mm) bead of DOW 832 sealant in the groove and latch the seal.

13
00:01:28,375 --> 00:01:36,583
4. Apply a 0.125-inch (3.18-mm) bead of sealant to the latch joint.

14
00:01:36,583 --> 00:01:39,375
<b>Note:</b> Remove excess sealant.

15
00:01:39,375 --> 00:01:43,542
Ensure that the sealing surfaces are not pinched or folded.