﻿1
00:00:00,000 --> 00:00:07,625
20. Connect the speed sensor cable of the traction motor combo to its connection under the locomotive platform. 

2
00:00:07,625 --> 00:00:12,875
21. If equipped, connect the bearing temperature sensor cables. 

3
00:00:12,875 --> 00:00:20,958
22. Connect all power cables and the traction motor ground cable to their connections under the locomotive platform. 

4
00:00:20,958 --> 00:00:30,125
23. Release and remove all jacks and chocks used to support or secure the truck for traction motor combo removal. 

5
00:00:30,125 --> 00:00:35,417
24. Activate the brakes by opening the truck cut-out cock. 

6
00:00:35,417 --> 00:00:41,833
25. Check the level of lubricant in the gear case, and add lubricant as required.