Typical steps to install the traction motor combo into the high adhesion truck are as follows: 

2
00:00:06,333 --> 00:00:16,250
1. Remove all dirt and weld splatter from the traction motor nose suspension lugs and the traction motor nose suspension area of the truck frame. 

3
00:00:16,250 --> 00:00:25,208
2. Transfer the traction motor combo to the drop table, and place suitable blocking under the motor frame to raise the motor lugs. 

4
00:00:25,208 --> 00:00:35,250
<b>Note:</b> The traction motor nose must be raised so that the motor safety lugs engage the truck frame, and the traction motor nose suspension lugs clear the truck frame. 

5
00:00:35,250 --> 00:00:46,000
3. Position the drop table and the traction motor combo under the truck with the axle journal bearing housings aligned with the journal bearing housings in the truck frame. 

6
00:00:46,000 --> 00:00:59,625
4. Level the axle journal bearing housings, and apply C-clamps on each wheel rim below each side of the axle journal bearing housings to prevent it from rotating during traction motor combo installation. 

7
00:00:59,625 --> 00:01:06,167
<b>Note:</b> Ensure that the coil spring seats are in position on the axle journal bearing housings. 

8
00:01:06,167 --> 00:01:10,833
5. Raise the drop table with the traction motor combo.