﻿GET_GEVOMechL2_06_01_01_65 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:05,375
Typical steps to install the high adhesion truck under the locomotive are as follows:

2
00:00:05,375 --> 00:00:13,667
1. Space the trucks approximately 50 ft. (15.2 m) between traction pin bearing assemblies.

3
00:00:13,667 --> 00:00:19,917
<b>Note: </b>When installed on the locomotive, the transom ends of the trucks must be facing each other.

4
00:00:19,917 --> 00:00:25,958
2. Remove the temporary dust covers from the traction motor air duct openings.

5
00:00:25,958 --> 00:00:34,833
3. Inspect the traction motor air ducts between the locomotive platform and the truck and replace any air ducts that are cracked or torn.

6
00:00:34,833 --> 00:00:40,958
4. Coat the center pin on the underside of the locomotive platform with grease.

7
00:00:40,958 --> 00:00:50,292
5. Lower the platform onto the truck (or raise the truck on the drop table), then carefully mate the center pin with the center pin bearing.

8
00:00:50,292 --> 00:00:57,958
<b>Note: </b>Ensure that the two tangs on top of each of the four loadbearers per truck register properly in the locomotive platform.