﻿GET_GEVOMechL2_06_01_01_63 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:10,208
4. Under the locomotive platform, disconnect the traction motor leads, ground cables, and speed-sensor cables leading to each traction motor.

2
00:00:10,208 --> 00:00:15,417
5. Disconnect the ground cable between the truck and the platform.

3
00:00:15,417 --> 00:00:25,583
6. Disconnect the traction motor air ducts from the top of the traction motors, then cover the traction motor openings to prevent entrance of foreign material.

4
00:00:25,583 --> 00:00:38,708
7. If an axle alternator is installed on the truck being removed, disconnect the alternator cable from the junction box on the alternator, then coil and secure the cable so it will not be damaged.

5
00:00:38,708 --> 00:00:47,542
8. Disconnect all sander hoses from the sander brackets on the truck and disconnect the hoses for the flange lubricators if used.



