14. For traction motor combos in positions 1, 3, 4, and 6, connect axle snubbers to the journal box adapters at both ends of the axle, then torque the snubber bolts to 197 to 219 lb.-ft. (267 to 297 Nm).

2
00:00:19,792 --> 00:00:24,750
15. Connect the traction motor air duct to the top of the motor.

3
00:00:24,750 --> 00:00:35,625
16. Lubricate the air duct bolts with a Wabtec approved Moly-based lubricant (84B565364A1) or light machine oil.

4
00:00:35,625 --> 00:00:43,625
17. Install the bolts and then torque to 50 to 55 lb.-ft. (68 to 75 Nm).

5
00:00:43,625 --> 00:00:56,125
18. If the traction motor combo installed is one of the end assemblies on the truck, return the sand brackets at both ends of the axle, then install and torque the sand bracket bolts to the proper value.

6
00:00:56,125 --> 00:01:02,750
19. Install the brake shoes and the slack adjustor pins, then adjust the slack adjusters.