22. Lower the drop table until the traction motor combo clears the truck and remove any remaining truck pedestal liners.

2
00:00:09,208 --> 00:00:14,917
23. Move the traction motor combo from beneath the truck and locomotive.

3
00:00:14,917 --> 00:00:29,167
<b>Caution:</b> If the gear case is still filled with oil, it cannot be tilted more than 4 inches (102 mm) end to end from horizontal because the oil will run around the seals and drain into the traction motor.

4
00:00:29,167 --> 00:00:47,750
<b>Warning:</b> The AC traction motor combo weighs approximately 13,270 lbs. (6,019 kg), and the DC traction motor combo weighs approximately 12,000 lbs. (5,443 kg).

5
00:00:47,750 --> 00:00:53,792
Ensure that an adequate crane and cables are used to lift and move the traction motor combo.

6
00:00:53,792 --> 00:01:04,667
24. Using a suitable hoist, lift the traction motor combo from the drop table and move it to the area assigned for cleaning, maintenance, or storage.

7
00:01:04,667 --> 00:01:14,125
25. Set the traction motor frame in the normal horizontal position on blocks high enough so that the wheels clear the floor.