﻿GET_GEVOMechL2_06_01_01_30 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:05,542
2. Install the DC traction motor nose suspension as follows:

2
00:00:05,542 --> 00:00:11,125
a. Slide the nose suspension assembly sideways, into the truck frame.

3
00:00:11,125 --> 00:00:22,208
b. Lower the traction motor combo slightly, and install the cotter pins and retaining pins, securing the vertical keeper pins in the nose suspension assembly.

4
00:00:22,208 --> 00:00:27,208
c. Loosen the nuts to de-compress the nose suspension assembly.

5
00:00:27,208 --> 00:00:41,750
d. Remove the 1/2-13 x 6.5 inch (165 mm) long bolt and nuts previously installed between the U-channels on both sides of the nose suspension assembly.

6
00:00:41,750 --> 00:00:45,833
e. Lower the traction motor nose into position.