﻿GET_GEVOMechL2_06_01_01_14 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:05,958
Typical steps to insert shims between the coil spring and spring pads are as follows:

2
00:00:05,958 --> 00:00:11,500
1. Position the traction motor combo over a drop table.

3
00:00:11,500 --> 00:00:16,375
2. Remove the axle bearing housing retainers.

4
00:00:16,375 --> 00:00:28,625
3. Lower the drop table until the space between the top of the axle bearing housing and the truck frame is approximately 7 inches (178 mm).

5
00:00:28,625 --> 00:00:40,625
4. At each of the four coil springs, place a spring retaining strap around the truck frame, UNDER the air piping and THROUGH the spring coils at approximately the fifth coil.


