﻿GET_GEVOMechL2_05_01_01_65 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:06,792
Typical steps to remove one of the air-to-air heat exchangers from the air-based intercooler are as follows:

2
00:00:06,792 --> 00:00:18,208
<b>Warning: </b>To prevent personal injury and potential equipment damage, ensure that the engine cannot be started before removing, installing, or adjusting any engine component.

3
00:00:18,208 --> 00:00:22,583
Place the BS in the OFF position to prevent starting attempts.

4
00:00:22,583 --> 00:00:28,042
Also, place the FPB and the LCCB in the OFF position.

5
00:00:28,042 --> 00:00:31,875
Also, apply a warning tag on the EC switch.

6
00:00:31,875 --> 00:00:39,375
<b>Warning: </b>If the locomotive is equipped with AESS, the diesel engine may start without operator action.

7
00:00:39,375 --> 00:00:43,667
Exercise caution when working around the radiator cab.

8
00:00:43,667 --> 00:00:50,042
Ensure that AESS is disabled before performing any maintenance procedures on the locomotive.

9
00:00:50,042 --> 00:00:54,583
Failure to do so may result in death or serious personal injury.

10
00:00:54,583 --> 00:01:03,792
<b>Note: </b>The following steps are performed with the air-based intercooler removed from the locomotive and sitting on the ground on an appropriate support stand.

11
00:01:03,792 --> 00:01:12,125
<b>Warning: </b>All lifting fixtures and support stands referenced have been individually manufactured, tested, and certified.

12
00:01:12,125 --> 00:01:23,125
Lifting devices manufactured by other facilities per these recommended numbers should be individually tested and certified by an appropriate outside testing agency before use.

13
00:01:23,125 --> 00:01:28,542
Follow all Railroad Operating/Shop Procedures concerning lifting devices.

14
00:01:28,542 --> 00:01:36,417
1. Unbolt and remove the close off angles that secure the top of the air-to-air heat exchanger in place.

15
00:01:36,417 --> 00:01:44,375
2. Unbolt the air-to-air heat exchanger shoulder and lower mounting bolts at all four corners of each heat exchanger.

16
00:01:44,375 --> 00:01:49,417
<b>Note: </b>It is not necessary to unbolt the shutter mounting bolts.

17
00:01:49,417 --> 00:01:58,417
<b>Warning: </b>Each individual air-to-air heat exchanger weighs approximately 620 lbs. (281 kg).

18
00:01:58,417 --> 00:02:03,792
Use a crane or appropriate lifting device to avoid personal injury or death.

19
00:02:03,792 --> 00:02:15,875
3. Attach the lifting fixture (TESCO T65420) to the top of the air-to-air heat exchanger using all four tapped holes in the side rails of the heat exchanger.

20
00:02:15,875 --> 00:02:24,792
4. Using the lifting fixture, lift and slide the old air-to-air heat exchanger out of the sheet metal pocket support frame.