8. Using an appropriate lifting device, lift and install the return ducts to the IFE cover of the engine.

2
00:00:07,333 --> 00:00:15,792
9. Place the return ducts in the air-to-air frame and attach the return pipe brackets with fasteners that were removed during removal.

3
00:00:15,792 --> 00:00:28,667
<b>Note: </b>Ensure that the B-side of the return duct flange is installed as far to the center of the cab as possible (towards the A-side) to avoid interference with the B-side turbo discharge duct during operation.

4
00:00:28,667 --> 00:00:35,125
10. Connect the return ducts to the top outboard connections of the air-based intercooler package.

5
00:00:35,125 --> 00:00:40,792
<b>Note: </b>Access the ducts through the top and inside the combustion air filter compartment.

6
00:00:40,792 --> 00:00:46,583
11. Connect the intermediate ducts at the lower "V" area of the air-based intercooler.

7
00:00:46,583 --> 00:00:51,500
12. Install the side screens on both sides of the locomotive.

8
00:00:51,500 --> 00:00:57,250
13. Install the top covers over the air-based intercooler package.

9
00:00:57,250 --> 00:01:10,750
14. With the air-based intercooler package installed, re-fill the locomotive cooling water system as discussed in the Split Cooling Water System module of this course in preparation for returning the locomotive to service.