﻿GET_GEVOMechL2_05_01_01_61 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:05,958
<b>Note: </b>The intermediate ducts connect the water-based intercooler and the air-to-air heat exchangers.

2
00:00:05,958 --> 00:00:11,000
Access the ducts through the top and inside the combustion air filter compartment.

3
00:00:11,000 --> 00:00:17,125
6. Unbolt the intermediate ducts at the lower "V" area of the air-based intercooler.

4
00:00:17,125 --> 00:00:22,417
<b>Note: </b>The return ducts connect the air-to-air heat exchangers and the engine.

5
00:00:22,417 --> 00:00:31,083
7. Unbolt the return ducts at the 8-inch Victaulic couplings on the top outboard connections of the air-based intercooler package.

6
00:00:31,083 --> 00:00:39,292
8. Remove and retain the fasteners from the clamp of the return duct bracket on both the A-side and B-side of the locomotive.

7
00:00:39,292 --> 00:00:43,792
9. Remove the return ducts from the IFE cover of the engine.

8
00:00:43,792 --> 00:00:51,000
10. Attach the lifting hook and strap at each pipe assembly and lift the return ducts from the locomotive.

9
00:00:51,000 --> 00:01:00,958
11. Disconnect the wiring at the six “red apple” insulators on the helper's side (B-side) of the locomotive at the rear end of the inlet screen.

10
00:01:00,958 --> 00:01:07,542
12. Cut the fasteners holding these wires to the tape rail on the radiator cab structure.

11
00:01:07,542 --> 00:01:17,833
13. Disconnect the grease fittings at the connection points through the side screen at the front end on the engineer's side (A-side) of the locomotive.
