﻿GET_GEVOMechL2_03_01_01_78 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:05,667
11. Install the B-side access plate cover with a new air side O-ring.

2
00:00:05,667 --> 00:00:17,458
12. Torque the 10, 1/2-inch hex bolts to 55-62 lb.-ft. (75-84 Nm).

3
00:00:17,458 --> 00:00:31,125
<b>Note:</b> Depending on the fabricated WBIC shell design, it may also be necessary to install Allen bolts that were previously removed from the front end of the intercooler shell in order to remove the intercooler core.

4
00:00:31,125 --> 00:00:41,083
If so, install and torque the Allen bolts to 31-33 lb.-ft. (42-45 Nm).

5
00:00:41,083 --> 00:00:49,417
13. Using new gaskets, re-install the Victaulic couplings that secure the piping to the intercooler on the B-side.

6
00:00:49,417 --> 00:00:59,500
<b>Note:</b> For additional information on assembly and installation of the Victaulic couplings, refer to the Victaulic Coupling Installation section of this module.

7
00:00:59,500 --> 00:01:02,625
14. Reconnect the vent fitting.

8
00:01:02,625 --> 00:01:17,625
15. Refill the cooling water system, if required as discussed in the Filling the Cooling Water System section of this module, and visually inspect the intercooler and associated piping for signs of leakage or damage.

9
00:01:17,625 --> 00:01:24,333
16. Re-install the maintenance access panel underneath the wing of the radiator cab.