﻿GET_GEVOMechL2_03_01_01_76 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:17,625
6. After the intercooler core has been placed in the radiator cab, install the rectangular cover using the 20, 3/8-inch hex bolts, then torque the bolts to 22-24 lb.-ft. (30-33 Nm).

2
00:00:17,625 --> 00:00:31,583
7. Install the seal plate around the drain fitting using the four 3/8-inch hex bolts, then torque the bolts to 22-24 lb.-ft. (30-33 Nm).

3
00:00:31,583 --> 00:00:45,792
8. Install the two bolts and washers near the top of the cover, then torque the bolts to 110-120 lb.-ft. (149-163 Nm).

4
00:00:45,792 --> 00:00:51,542
9. Attach the drain hose and fitting, and close the access door.

5
00:00:51,542 --> 00:01:01,458
10. Remove and disassemble the puller tool (PSB P5205) from the B-side of the locomotive.
