﻿GET_GEVOMechL2_03_01_01_74 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:09,917
8. Using a 1/2-inch air ratchet with a 3/4-inch socket, turn the worm gear and remove the core attached to the puller tool puller bar.

2
00:00:09,917 --> 00:00:20,542
9. After the core has fully cleared the wing of the radiator cab and is stationary on the cradle support, install the four, 1/2-inch lifting eye bolts.

3
00:00:20,542 --> 00:00:23,833
10. Lift the core off the cradle.

4
00:00:23,833 --> 00:00:28,833
<b>Note:</b> Ensure that the movement of the core is away from the radiator cab.

5
00:00:28,833 --> 00:00:31,625
Do not simply lift the core straight up.

6
00:00:31,625 --> 00:00:36,167
11. Place the core on a stable work surface.