﻿GET_GEVOMechL2_03_01_01_47 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:05,917
Typical steps to fill the cooling water system with pretreated water are as follows:

2
00:00:05,917 --> 00:00:14,375
<b>Caution:</b> Do not check or add cooling water until the engine has been idling for at least ten minutes with the green LED on.

3
00:00:14,375 --> 00:00:24,542
Do not fill the cooling water system above the FULL AT IDLE mark, because the system may run cold, causing serious engine damage and possibly frozen radiators.

4
00:00:24,542 --> 00:00:35,375
Do not allow the level to go below the LOW AT IDLE mark, because water pump cavitation will take place, resulting in low water pressure, poor cooling, and a hot engine.

5
00:00:35,375 --> 00:00:40,958
1. Attach the water supply hose to the water fill pipe connection.

6
00:00:40,958 --> 00:00:44,458
2. Turn on the water supply.

7
00:00:44,458 --> 00:00:51,792
3. Vent pressure from the system by holding the flag vent valve down for at least 60 seconds.













