﻿GET_GEVOMechL2_03_01_01_119 - ANIMATION Screen
1
00:00:00,000 --> 00:00:06,458
Summarize the steps to remove and install the major components of the split cooling water system.

2
00:00:06,458 --> 00:00:09,333
Water Pump Removal and Installation

3
00:00:09,333 --> 00:00:18,417
For instructions on water pump removal and installation, refer to the Water Pump Removal and Installation module of the Diesel Engine Advanced course.

4
00:00:18,417 --> 00:00:21,917
Lubricating Oil Cooler Removal and Installation

5
00:00:21,917 --> 00:00:31,542
For instructions on lubricating oil cooler removal and installation, refer to the Lubricating Oil System module of the Mechanical Systems Advanced course.

6
00:00:31,542 --> 00:00:34,333
Fabricated WBIC Removal

7
00:00:34,333 --> 00:00:36,833
1. Shut down the diesel engine.

8
00:00:36,833 --> 00:00:40,042
2. Depressurize the cooling water system.

9
00:00:40,042 --> 00:00:43,208
3. Ensure the radiators contain no water.

10
00:00:43,208 --> 00:00:48,583
4. Drain the water from the cooling water system below the level of the water-based intercooler.

11
00:00:48,583 --> 00:00:52,125
5. From the A-side (right side) of the locomotive:

12
00:00:52,125 --> 00:00:55,750
a. Open, but do not remove, the access door.

13
00:00:55,750 --> 00:00:59,125
b. Remove the drain line and fitting from the drain pipe.

14
00:00:59,125 --> 00:01:05,125
c. Remove the two 5/8-inch hex bolts and washers near the top of the cover.

15
00:01:05,125 --> 00:01:12,208
d. Remove the 20, 3/8-inch hex bolts holding the A-side (right side) cover.

16
00:01:12,208 --> 00:01:20,833
e. Remove the four 3/8-inch hex bolts and seal plate surrounding the drain fitting and save all hardware for re-use.

17
00:01:20,833 --> 00:01:24,875
6. From the B-side (left side) of the locomotive:

18
00:01:24,875 --> 00:01:33,792
a. Remove the maintenance access panel from underneath the wing of the radiator cab, then set the panel aside and save all hardware for re-use.

19
00:01:33,792 --> 00:01:39,583
b. Disassemble and remove the Victaulic couplings securing the piping to the water-based intercooler.

20
00:01:39,583 --> 00:01:41,500
c. Disconnect the vent fitting.

21
00:01:41,500 --> 00:01:52,875
d. Loosen and remove the hex bolts and washers that secure the core access plate to the intercooler shell, then set aside the plate and all related hardware for re-use.

22
00:01:52,875 --> 00:02:02,875
7. Install the puller tool (PSB P5205) onto the B-side of the locomotive for removing the intercooler core, as follows:

23
00:02:02,875 --> 00:02:06,792
a. Install the support plate to the locomotive carbody.

24
00:02:06,792 --> 00:02:11,458
b. Set the support stand on the handrail allowing it to sit on the catwalk.

25
00:02:11,458 --> 00:02:15,708
c. Install the cradle support legs using ball lock pins.

26
00:02:15,708 --> 00:02:23,458
d. Install the cradle support using ball lock pins, then adjust the support so it is level with the bottom of the intercooler core.

27
00:02:23,458 --> 00:02:28,250
e. Install the puller tool puller bar onto the end of the intercooler core.

28
00:02:28,250 --> 00:02:37,500
8. Using a 1/2-inch air ratchet with a 3/4-inch socket, turn the worm gear and remove the core attached to the puller tool puller bar.

29
00:02:37,500 --> 00:02:47,000
9. After the core has fully cleared the wing of the radiator cab and is stationary on the cradle support, install the four, 1/2-inch lifting eye bolts.

30
00:02:47,000 --> 00:02:49,250
10. Lift the core off the cradle.

31
00:02:49,250 --> 00:02:52,958
11. Place the core on a stable work surface.