﻿GET_GEVOMechL2_03_01_01_91 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:05,833
Typical steps to install a Victaulic coupling on the cooling water system are as follows:

2
00:00:05,833 --> 00:00:17,083
<b>Warning:</b> To prevent personal injury and potential equipment damage, ensure that the engine cannot be started before removing, installing, or adjusting any engine component.

3
00:00:17,083 --> 00:00:21,417
Place the BS in the OFF position to prevent starting attempts.

4
00:00:21,417 --> 00:00:26,625
Also, place the FPB and the LCCB in the OFF position.

5
00:00:26,625 --> 00:00:30,458
Also, apply a warning tag on the EC switch.

6
00:00:30,458 --> 00:00:36,208
<b>Note:</b> Couplings used in the cooling water system have a seal made of EPDM rubber.

7
00:00:36,208 --> 00:00:41,375
EPDM rubber is indicated by a green mark on the inside of the gasket.

8
00:00:41,375 --> 00:00:47,875
Couplings used in the lubricating oil system are indicated by a blue mark on the inside of the gasket.

9
00:00:47,875 --> 00:00:53,750
Couplings used in the compressed air system are completely red and made from silicon gasket.

10
00:00:53,750 --> 00:00:59,750
1. Inspect the gaskets for cuts, holes, or embedded foreign material.

11
00:00:59,750 --> 00:01:03,750
2. Inspect the sealing surfaces of the pipe.

12
00:01:03,750 --> 00:01:09,500
<b>Note:</b> Rough or non-machined surfaces do not indicate a defective pipe.

13
00:01:09,500 --> 00:01:17,042
However, there must not be scratches or gouges that cross more than 50% of the sealing surface.

14
00:01:17,042 --> 00:01:24,417
If scratches or gouges are present, use sandpaper or a fine file to dress the pipe surfaces.

15
00:01:24,417 --> 00:01:30,208
If defects cannot be removed without excessive sanding, the pipe should be replaced.

16
00:01:30,208 --> 00:01:37,042
3. Inspect the cleanliness of the pipe and ensure it is clean and free of debris.

17
00:01:37,042 --> 00:01:43,458
<b>Note:</b> Coupling seals used in both oil and water systems should be thoroughly lubricated.

18
00:01:43,458 --> 00:01:48,500
This prevents tearing or cutting the gasket when it is assembled.

19
00:01:48,500 --> 00:01:56,875
4. Slide both gaskets onto the fixed end of the pipe ensuring that each gasket is flush with the end.