﻿GET_GEVOMechL2_02_01_01_94 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:08,667
5. Insert the pipe with one person holding the pipe in position while another person carefully slides the gasket into place. 

2
00:00:08,667 --> 00:00:17,083
<b>Note: </b>To ensure that the gasket is properly located on the pipe, both corners of the gasket's sealing surface must be exposed. 

3
00:00:17,083 --> 00:00:27,292
<b>Note: </b>There should be approximately a 0.125-inch (3.18-mm) gap between the pipe ends to allow for expansion. 

4
00:00:27,292 --> 00:00:41,917
The gap between the lubricating oil piping lengths can be adjusted by loosening the four 0.5-inch (12.7-mm) bolts at the flange at one end of the pipe, moving the pipe into the desired location. 

5
00:00:41,917 --> 00:00:45,167
Re-tighten the bolts to seal the pipe. 

6
00:00:45,167 --> 00:00:56,250
6. Install the coupling halves, then install the bolts and nuts ensuring that the oval under each bolt head is mated into the recessed oval in the coupling half. 

7
00:00:56,250 --> 00:01:02,750
7. Tighten the nuts until there is a metal-to-metal contact between the coupling halves. 

8
00:01:02,750 --> 00:01:17,333
8. Once the Victaulic coupling is replaced, close the BS and then close the LCCB, FPB, and BCCB on the EC panel, remove the warning tag from the EC switch, and start the engine.