﻿GET_GEVOMechL2_02_01_01_88 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:07,708
7. Remove the terminal junction box cover on the side of the pre-lube motor by removing the six screws.

2
00:00:07,708 --> 00:00:16,000
8. Insert the wires and plastic conduit through the top conduit hole in the terminal junction box and tighten the conduit fitting.

3
00:00:16,000 --> 00:00:29,708
9. Connect the wire lugs into the terminals inside the terminal junction box and tighten to 120-140 lb.-in (13.56-15.82 Nm).

4
00:00:29,708 --> 00:00:42,042
10. Re-install the cover on the terminal junction box and torque the six screws to 20-25 lb.-in (2.26-2.82 Nm).

5
00:00:42,042 --> 00:00:49,417
11. Install the locomotive handrail section that was removed during pre-lube pump and motor assembly removal.

6
00:00:49,417 --> 00:00:58,708
12. Fill the lubricating oil system as discussed in the fill portion of the Lubricating Oil System Drain and Initial Fill section of this module.