7. Re-install the cover on the terminal junction box and torque the six screws to 20-25 lb.-in (2.26-2.82 Nm).

2
00:00:12,625 --> 00:00:20,792
8. Remove the four mounting bolts that secure the pre-lube pump and motor assembly to the floor of the radiator cab. 

3
00:00:20,792 --> 00:00:29,125
<b>Warning: </b>The pre-lube pump and motor assembly weighs approximately 125 lbs. (57 kg). 

4
00:00:29,125 --> 00:00:33,875
Ensure the lifting device, cables, and straps are adequate. 

5
00:00:33,875 --> 00:00:38,375
Failure to do so may result in personal injury or death. 

6
00:00:38,375 --> 00:00:49,792
9. With the appropriate lifting device, gently slide the pre-lube pump and motor assembly from the radiator cab, and then lift and remove the assembly from the walkway.