7. Connect the oil cooler to the oil filter housing as follows:

2
00:00:04,958 --> 00:00:18,208
a. Remove the plugs and unblock all flange and pipe openings, then reconnect the oil filter housing drain back valve flange and drain piping assembly and install the previously removed hardware.

3
00:00:18,208 --> 00:00:31,875
b. Remove the plugs and unblock all flange and pipe openings, then reconnect the pipe sections on the back of the oil filter housing crossing over the oil cooler and install the previously removed hardware.

4
00:00:31,875 --> 00:00:42,333
c. Remove the blanking plate and plugs and then reconnect the piping connecting the oil cooler to the oil filter housing and install the previously removed hardware.

5
00:00:42,333 --> 00:00:46,833
8. Install the previously removed handrail section.

6
00:00:46,833 --> 00:00:55,667
9. Refill the cooling water system and visually inspect the intercooler and associated piping for signs of leakage or damage.

7
00:00:55,667 --> 00:01:11,000
10. Once the lubricating oil cooler is installed, close the BS and then close the LCCB, FPB, and BCCB on the EC panel, remove the warning tag from the EC switch, and start the engine.

8
00:01:11,000 --> 00:01:22,292
11. With the engine at IDLE, check and fill the crankcase lubricating oil level as discussed in the Lubricating Oil Level Check and Fill section of this module.