﻿GET_GEVOMechL2_02_01_01_100 - STEP-BY-STEP Screen
1
00:00:00,000 --> 00:00:04,542
Typical steps to install the coalescer hoses are as follows: 

2
00:00:04,542 --> 00:00:16,833
<b>Warning: </b>To prevent personal injury and potential equipment damage, ensure that the engine cannot be started before removing, installing, or adjusting any engine component. 

3
00:00:16,833 --> 00:00:21,125
Place the BS in the OFF position to prevent starting attempts. 

4
00:00:21,125 --> 00:00:30,500
Also, place the FPB, LCCB, and BCCB in the OFF position, and apply a warning tag on the EC switch. 

5
00:00:30,500 --> 00:00:37,958
<b>Warning: </b>If the locomotive is equipped with AESS, the diesel engine may start without operator action. 

6
00:00:37,958 --> 00:00:42,083
Exercise caution when working around the radiator cab. 

7
00:00:42,083 --> 00:00:47,875
Ensure that AESS is disabled before performing any maintenance on the locomotive. 

8
00:00:47,875 --> 00:00:52,958
Failure to do so may result in death or serious personal injury. 

9
00:00:52,958 --> 00:01:01,042
1. Inspect the coalescer hoses for cracks, holes, or other defects, and replace if needed. 

10
00:01:01,042 --> 00:01:07,250
2. Apply anti-seize compound to the exterior of the attachment pipes. 

11
00:01:07,250 --> 00:01:17,667
3. Ensure that the clamps are located loosely around the hose cuffs at both ends of the hoses, and then install the hose ends over the attachment pipes. 

12
00:01:17,667 --> 00:01:25,375
4. Rotate the clamps around the hoses such that the bolt is in a convenient position for adjustment. 

13
00:01:25,375 --> 00:01:41,292
5. Position the hoses so that they will not make contact with the engine or other engine components, then torque each 9/16-inch (15-mm) clamp bolt to 5 lb.-ft. (7 Nm).