7. Reconnect the metal plate to the bottom of the platform using the two bolts while ensuring the grease lines are not twisted, then torque the bolts to 100 lb.-ft. (136 Nm).

2
00:00:13,625 --> 00:00:27,333
8. Carefully feed the three alternator blower motor leads and flexible metal conduit through the blower cab floor, then install the locknut to secure the motor lead conduit to the bottom of the blower cab.

3
00:00:27,333 --> 00:00:34,667
9. Connect the motor leads to the terminal block, ensuring that each lead is connected to the correct terminal.

4
00:00:34,667 --> 00:00:38,583
<b>Caution:</b> Be sure to connect the leads correctly.

5
00:00:38,583 --> 00:00:44,625
Improper connection may cause the blower to run backwards, which greatly decreases airflow.

6
00:00:44,625 --> 00:00:50,083
This can shorten the life of and seriously damage the alternator and control equipment.

7
00:00:50,083 --> 00:00:59,293
10. Lift and set the roof hatch on the blower cab with a crane, then install the hardware to secure the hatch of the blower cab.