﻿GET_GEVOMechL2_10_01_01_37 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:09,458
5. Remove the two nuts securing the alternator blower grease fitting lines to the floor of the blower cab on the Engineer's side of the locomotive.

2
00:00:09,458 --> 00:00:14,583
6. Remove the four alternator blower mounting bolts.

3
00:00:14,583 --> 00:00:20,208
<b>Note:</b> An industrial-type putty strip is used between the blower and the mounting surface.

4
00:00:20,208 --> 00:00:31,125
A jacking bolt hole, located in one corner of the blower, may be used with one of the mounting bolts as a jacking bolt to break the seal between the alternator blower and the mounting surface.

5
00:00:31,125 --> 00:00:39,042
<b>Warning:</b> The alternator blower weighs approximately 1090 lbs. (494 kg).

6
00:00:39,042 --> 00:00:42,042
Ensure that the lifting device is adequate.

7
00:00:42,042 --> 00:00:51,208
7. Attach cable-lifting slings to the blower lifting lugs, and carefully lift the alternator blower out of the cab with a crane.

8
00:00:51,208 --> 00:00:56,542
8. Set the blower upright on a skid in a level position.