﻿GET_GEVOMechL2_10_01_01_31 - STEP-BY-STEP Cont Screen
1
00:00:00,000 --> 00:00:12,125
5. Install the traction motor blower mounting hardware and torque the bolts to 280 to 300 lb.-ft. (380 to 407 Nm).

2
00:00:12,125 --> 00:00:21,375
6. Install the electrical connection box and support assembly to the platform, then secure with bolts and lockwashers. 

3
00:00:21,375 --> 00:00:35,292
7. Connect the three motor leads to the traction motor blower electrical connection box terminals, ensuring that each lead is connected to the proper terminal, then tie-wrap the lead bundle to the tape rail.

4
00:00:35,292 --> 00:00:51,292
<b>Caution:</b> When the power leads to the equipment blower motor or the equipment blower motor drive regulator (EBP), which controls the motor, have been disconnected at either end for any reason, it is possible to incorrectly connect the leads at reinstallation.

5
00:00:51,292 --> 00:00:59,250
If any two power leads are swapped at either end, the blower may still operate; but it will rotate backwards.

6
00:00:59,250 --> 00:01:03,917
Backward running of the equipment blower will greatly decrease the air flow.

7
00:01:03,917 --> 00:01:10,042
This reduced ventilation can shorten the life and/or do serious damage to the traction motors.

8
00:01:10,042 --> 00:01:20,458
<b>Note:</b> The speed sensor gap should be 0.020 to 0.030 inches (0.51 to 0.76 mm).

9
00:01:20,458 --> 00:01:25,417
This gap is set at the factory and normally does not need to be readjusted.

10
00:01:25,417 --> 00:01:35,792
8. Install the criss-cross structural braces, and torque bolts to 329 lb.-ft. (446 Nm).

11
00:01:35,792 --> 00:01:40,958
9. Install the previously removed section of handrail.

12
00:01:40,958 --> 00:01:52,500
10. Verify correct blower air output by checking the exhaust port of the blower to ensure correct blower motor wiring, and ensure the proper air flow direction.